![](https://morganasphalt.com/wp-content/uploads/2015/05/F-22-HAFB_1.jpg)
Hill Air Force Base F-22
The scope of work for Morgan Asphalt on the Hill Air Force Base F-22 hangar consisted of all the site excavation, concrete prep and asphalt work.
![](https://morganasphalt.com/wp-content/uploads/2015/05/F-22-HAFB_2.jpg)
![](https://morganasphalt.com/wp-content/uploads/2015/05/F-22-HAFB_3.jpg)
This included digging, building footings, construction on the building pad, and paving aircraft taxi ways. Ear protection was a constant safety concern, as regular aircraft flying schedules were maintained.
![](https://morganasphalt.com/wp-content/uploads/2015/05/F-22-HAFB_4.jpg)
![](https://morganasphalt.com/wp-content/uploads/2015/05/F-22-HAFB_5.jpg)